ProtectionAcademy
2.350 min · Intermediate

CT Transient Saturation (IEEE C37.110)

DC offset, remanence and burden: why steady-state CT sizing fails.

You will be able to
  • ▸Apply the (1 + X/R)·I_f·Z_b ≤ 20 screening criterion
  • ▸Compute secondary loop burden for 5 A and 1 A secondaries
  • ▸Predict time-to-saturation and the effect of remanent flux
  • ▸Choose remedies: full-ratio taps, dedicated cores, 1 A secondaries, higher C-class
Standards
IEEE C37.110IEEE C57.13IEEE C57.13.3
Start here

A CT is a transformer that can run out of flux

A current transformer (CT) makes a small replica of a large primary current, for example 5 A for every 1200 A. Every differential, distance and directional element in the collector substation depends on that replica. To drive secondary current through the relay, leads and its own winding, the CT has to develop a voltage. That voltage comes from changing magnetic flux in the core.

A core can only hold so much flux. Past the saturation point the magnetising branch stops behaving like a high impedance and starts absorbing most of the current. The secondary waveform collapses into flat-topped or gapped pulses, while the primary keeps flowing. The relay sees a current that is smaller, distorted and phase-shifted, usually at exactly the moment it most needs an accurate one.

The flux a CT needs is proportional to the time-integral of the secondary voltage, λ=∫R is dt\lambda = \int R\,i_s\,dt. A symmetrical sine wave integrates to a flux that swings evenly up and down. A fault with a decaying DC offset integrates to a flux that keeps climbing for several cycles. That one fact drives this whole module.

Physics

DC offset, X/R and the (1 + X/R) flux multiplier

When a fault starts at an unfavourable point on the voltage wave, the current must start from zero but settle to a sinusoid. The difference is a DC component that decays with the primary time constant:

ip(t)=2 I[sin⁡(ωt+θ−φ)−sin⁡(θ−φ) e−t/τ],τ=X/Rωi_p(t)=\sqrt2\,I\left[\sin(\omega t+\theta-\varphi)-\sin(\theta-\varphi)\,e^{-t/\tau}\right],\qquad \tau=\frac{X/R}{\omega}

Transmission-level sources have X/R of roughly 10–20, giving τ of 26–53 ms (1.6–3.2 cycles). Distribution feeders sit nearer X/R 3–6. Near a large main power transformer, at HV bushing CTs and close to generators, X/R of 30–50 or more is normal (τ of 80–130 ms), and those are the worst saturation cases. If the CT is to reproduce the whole offset wave without saturating, its core must support the AC flux plus the integral of the DC term. The bound on that total is (1+X/R)(1+X/R) times the symmetrical flux.

Interactive lab
Why DC offset multiplies the flux the core needs
A fully offset fault current (top trace) and the flux the CT core must carry to reproduce it (bottom). With no offset the flux swings to ±1; with an offset it ratchets up toward roughly 1 + X/R. That is the standard approximation, not a strict bound: at low X/R the exact peak is slightly higher, and at high X/R it arrives several cycles later.
12
τ = X/(Rω)
31.8ms
Peak flux demand
13.0× sym.
in 200 ms
Approx. ceiling 1 + X/R
13.0×
050100150200-1-0.500.511.52Time (ms)i (pu peak)05010015020002.557.51012.5Time (ms)flux (× sym. peak)1 + X/R = 13.0symmetrical peak-to-peak swing
IEEE C37.110

The screening criterion and the secondary loop

The C37.110 screening test for a C-class CT, with every quantity in per-unit, is:

(1+XR)If Zb  ≤  20\left(1+\frac{X}{R}\right) I_f\, Z_b \;\le\; 20

Here IfI_f is the maximum symmetrical fault current in per-unit of the CT rating (on the tap in use) and ZbZ_b is the total secondary burden in per-unit of the standard burden for the CT's C-class. A C400 CT is rated to deliver 20 × 5 A = 100 A into a 4 Ω standard burden (B-4.0) with at most 10% ratio error, so its standard burden is 4 Ω. This lab counts the CT winding resistance in the loop, which is conservative. Some practitioners include it in the burden and others in the excitation voltage. Be consistent within a study. (The lab's screen counts Rct as burden, while its voltage test credits Rct in VsatV_{sat}, so near the boundary the two checks can disagree. Treat either failure as a fail.)

The physical burden is the series loop the secondary current has to drive:

Rtot=Rct+2Rlead+Rrelay+Rother,Rrelay=VAIn2R_{tot} = R_{ct} + 2R_{lead} + R_{relay} + R_{other},\qquad R_{relay} = \frac{\text{VA}}{I_n^2}
Contributor5 A secondary1 A secondaryComment
Leads, 2 × 500 ft of 10 AWG at 75 °C≈ 1.24 Ω → 31 VA at 5 A≈ 1.24 Ω → 1.24 VA at 1 ACopper does not care about the CT rating
CT winding, 1200:5 full ratio≈ 0.4 Ω≈ 10 ΩSame core, 5× the turns of thinner wire: Rct rises about 25×
Relay, 0.5 VA input0.02 Ω0.5 ΩNumerical relays are tiny burdens
Standard burden, same core (C400 at 5 A)4 Ω100 ΩPer-unit lead burden falls 25×; per-unit winding burden does not
Representative values. Size leads at 75 °C (copper resistance is about 22% higher than at 20 °C). Always use the measured lead run, gauge, the manufacturer's Rct and the relay's published burden.

Worked example

Here is a collector substation breaker CT example: maximum external fault 25 kA symmetrical, X/R = 12, 60 Hz, 1200:5 on full ratio, Rct=0.4 ΩR_{ct}=0.4\,\Omega (representative for a 1200:5 relaying winding; use the manufacturer's value), 50 ft of 10 AWG copper at 75 °C (1.24 Ω per 1000 ft), and a 0.5 VA relay. Find the required saturation voltage and the minimum C-class.

Simulator

Drive a CT into saturation, then fix it

The lab solves the CT equivalent circuit in the time domain. Watch three things together: the secondary current against the ideal ratio current, the core flux climbing toward ±λsat, and the excitation curve against the voltage the burden requires. The preset Saturating CT is a representative feeder CT on its 600:5 tap with 100 ft leads, a shared metering core and 60% remanence. Apply the remedies one at a time and note which ones matter most.

Interactive lab
CT Saturation Waveform Distortor
A time-domain model of the CT: an ideal ratio, a nonlinear magnetising branch and a purely resistive secondary loop (C37.110 gives a general form for burdens with reactance), stepped with implicit Euler at 192 samples per cycle. Start from the saturating preset, then apply remedies until the secondary matches the ideal waveform.
Primary system
6 kA
8
τ = 21 ms · 8-cycle window
0°
DC offset ≈ 99% of maximum
Current transformer (1200:5 MR)
600:5
C-class (at full ratio)
0.36 Ω
60%
Secondary circuit
100 ft
Lead gauge
0.5 VA
1 VA
Remedies
I sec (sym.)
50.0A rms
10.0× rated
R total loop
0.488Ω
Rct 0.180 · leads 0.248
(1+X/R)·If·Zb
43.9
must be ≤ 20
Time to saturate
6.9ms
0.42 cycles · first >10% error
V sat available
118V
C100 equiv. on tap
(1+X/R)·I·R
220V
full offset, no remanence
With remanence
549V
÷(1−60%)
Worst-cycle error
67%
rms, ideal vs actual
Secondary current
ideal i_p / Nactual i_s
020406080100120-100-50050100Time (ms)Asaturation
Core flux λ / λsat
fluxsaturation
020406080100120-1.5-1-0.500.511.5Time (ms)
Excitation curve (this tap)
1e-30.010.11101001101001kIe (A rms)Vsat 118 Vrequired 220 V
Fails: (1+X/R)·If·Zb > 20 and Vsat 118 V < 220 V required. Differential and directional elements will see a distorted secondary.
Remanence

The flux that stays behind

A CT core interrupted near peak flux, or magnetised by DC winding-resistance or polarity testing, can keep a large remanent flux. IEEE C37.110 cites a field survey in which a meaningful fraction of the CTs tested retained high remanence, some in the 61–80% range of saturation flux (check the guide for the exact figures). Treat that range as a worst case, not a typical value. If the remanence sits in the same direction as the next fault's DC offset, the core starts most of the way to saturation.

  • Gapless C-class cores keep remanence almost indefinitely in service. Normal load current does not reliably demagnetise them.
  • High-speed reclosing into a permanent fault is the classic worst case: remanence from the first trip and fresh DC offset add together.
  • Demagnetise CTs after DC tests (winding resistance, polarity checks) as part of commissioning procedure.
Bus protection

High-impedance bus differential (87B): saturation sets the setting

34.5 kV collector buses often use high-impedance bus differential. Every CT in the zone is paralleled at a junction point, and a high-impedance voltage element measures across the junction. For an external fault the scheme assumes the worst case outright: the CT on the faulted feeder saturates completely. Its magnetising branch is then a short, so the healthy CTs drive the whole secondary fault current through its winding and leads, and the relay sees

VR=IF (RCT+2Rlead),Vs>K IF (RCT+2Rlead)V_R = I_F\,(R_{CT} + 2R_{lead}),\qquad V_s > K\,I_F\,(R_{CT}+2R_{lead})

Here IFI_F is the maximum external fault current in secondary amps, RCTR_{CT} and RleadR_{lead} belong to the saturated CT and its run to the junction, and KK is the manufacturer's margin factor (often 1.5–2). Because the calculation assumes total saturation, it needs no X/R or remanence. That is why the scheme is so secure.

Representative example: 25 kA maximum external fault, 2000:5 CTs on full ratio (IF=62.5I_F = 62.5 A), R_CT = 0.8 Ω and 300 ft of 10 AWG to the junction (2Rlead=0.744 Ω2R_{lead} = 0.744\ \Omega at 75 °C). Then VR=62.5×1.544=96.5V_R = 62.5 \times 1.544 = 96.5 V, and with K = 1.5 the setting is about 145 V.

  • Identical ratios and full taps on every CT in the zone. Auxiliary CTs and tapped windings add impedance and break the assumption.
  • Dedicated cores with nothing else in the circuit.
  • A knee well above the setting. A common rule is a knee voltage of at least about 2 × V_s, so the CTs can drive the relay into operation for internal faults. Use the relay manual's criterion.
  • A voltage limiter (MOV) across the relay. For an internal fault the CTs try to drive current into a high impedance, and the peak voltage can reach several kilovolts.
  • Check sensitivity. The primary pickup is the CT ratio times the sum of the relay current, every CT's excitation current at V_s, and the MOV leakage. It must sit below the minimum internal fault.
IBR plants

When the problem is too little current

At an inverter-based plant the bigger CT problem is often sensitivity, not saturation. HV CTs are sized for the grid's fault duty, but the plant's own contribution is set by the inverter current limit: typically about 1.0–1.5 pu of rating (from the OEM's model), after a brief sub-cycle transient.

Representative example: a 100 MVA plant (100 MW at unity power factor) at 230 kV has a rated current of about 251 A. At 1.1–1.5 pu it contributes roughly 280–380 A primary. On a 2000:5 CT chosen for 40 kA of grid duty that is only 0.7–0.9 A secondary.

  • Relay minimum pickups and the CT's accuracy at low flux now govern. A C-class rating says nothing about either.
  • The usual fix for saturation, a higher (full) ratio, pushes the secondary current down further. A higher C-class on the same ratio doesn't change the secondary current, though higher C-classes often come with higher ratios. Sensitive elements may need a different core or ratio, a relay with wide dynamic range, or sequence- and voltage-based elements.
  • Ground faults are different: through the YNd main power transformer the plant end is a strong zero-sequence source (Module 4.1), so the shortage is mainly in phase and negative-sequence current.
Design practice

Engineering CTs for transients, not nameplates

  1. Use full-ratio taps on multi-ratio CTs for relaying wherever the load and pickup settings allow. A lower tap cuts the C-class voltage in proportion and raises secondary current at the same time.
  2. Dedicate cores. Give 87T and 87B their own relaying cores and never share them with revenue metering, transducers or panel meters.
  3. Specify 1 A secondaries in physically large switchyards and collector sites with long cable runs. Lead burden in per-unit falls by about 25×, but the winding resistance rises by about the same factor (5× the turns of thinner wire), so the net gain depends on how much of the loop is leads. The lab also gives the 1 A design 5× the C-class voltage, which holds for the same core with 5× the turns. How 1 A relaying CTs are rated and specified varies, so confirm the excitation data with the manufacturer.
  4. Match CTs within a differential zone where possible (similar C-class and burden), so any saturation is more symmetrical.
  5. Screen every protection CT with (1+X/R)IfZb≤20(1+X/R)I_fZ_b \le 20, then check time-to-saturation against the relay's requirement where it fails. Many numerical relay manuals state a minimum saturation-free time; the figure is vendor-specific, so take it from the manual.
  6. Demagnetise after DC tests, and consider remanence for reclosing duty.
Key takeaways
  • DC offset drives a unidirectional flux build-up of roughly (1 + X/R) times the symmetrical flux, and X/R can reach 30–50 near large transformers.
  • C37.110 screening: (1 + X/R)·If·Zb ≤ 20, using the tap in use and the total loop burden.
  • The '2π·I·R·T_cycles' rule equals (X/R)·I·R. The (1 + X/R) form is the conservative approximation.
  • Winding resistance and 75 °C lead resistance are often most of the loop. An unrealistically low Rct hides the real requirement.
  • Worst-case remanence of 60–80% can consume most of the flux margin. Demagnetise after DC tests.
  • Full-ratio taps, dedicated cores and short leads are the most effective remedies. 1 A secondaries help most when leads dominate.
  • High-impedance 87B assumes complete saturation, so its setting needs no X/R; its CTs need identical ratios, full taps and a high knee.
  • At IBR plants, low secondary current (sensitivity) can matter more than saturation.
Assessment

Knowledge check

0/8 answered
  1. Q1
    Why can't a CT be sized from the steady-state symmetrical fault current alone?
  2. Q2
    A 1200:5 C400 CT on full ratio sees 30 kA, X/R = 15, and a total loop burden of 0.4 Ω. What is (1+X/R) If Zb(1+X/R)\,I_f\,Z_b?
  3. Q3
    The worked example evaluates 6.28·I·R·T_cycles = 680 V and (1+X/R)·I·R = 737 V. How are the two related?
  4. Q4
    Field surveys have found some CTs retaining 61–80% remanent flux after fault interruption or DC testing (a worst case, not a typical value). What does 70% remanence in the worst-case direction do to the available flux margin?
  5. Q5
    Switching a long-lead application from 5 A to 1 A secondaries reduces the lead burden in per-unit of the CT's capability by roughly:
  6. Q6
    Why does using a lower tap on a multi-ratio CT hurt transient performance twice over?
  7. Q7
    Which relay functions in a collector substation are most exposed to CT saturation errors?
  8. Q8
    Why does a high-impedance bus-differential (87B) setting calculation not need the system X/R or the CT remanence?
Mastery challenge

Remediate a saturating feeder CT

Load the Saturating CT preset. Your job is to make this CT dependable for a fully offset fault, including remanence, using the fewest changes. Document each step as if writing a CT design memo.

Finished this module?